Pages

Congate Flat V Madipakkam, Chennai


Project Overview - Congate Flat V
Type Bedroom Area Price Floor
Apartments / Flats 3 BHK 1050 Sq ft Rs. 47.25 lakhs 1
Apartments / Flats 3 BHK 1050 Sq ft Rs. 47.25 lakhs 2
Apartments / Flats 3 BHK 1185 Sq ft Rs. 53.33 lakhs 1

Structure
  • RCC framed structure with columns and beams, brick paneled walls (exterior walls of 9" thickness and interior walls of 4½" thickness) plastered and painted.
Floor tiles
  • Vitrified Tiles (2" X 2")
Wall tiles
  • Bathroom: Glazed tiles for a height of 6'0".
  • Service Area: Glazed tiles for a height of 3'0".
  • Kitchen: Glazed tiles for a height of 2'0" above the platform.
Doors
  • Main door: Teak wood with Godrej / equivalent brand lock, brass handle, magic eye, brass bolt, brass hinges and rubber door stopper.
  • Other doors: Good quality Flush doors with Malaysian Sal frames, brass handle, brass hinges, brass tower bolt, good quality lock and rubber door stopper.
  • Bathroom and Service area doors: Fibre door with powder coated handle and brass tower bolt.
Windows
  • Powder coated aluminum sliding type, with Plain glass and MS grills.
Kitchen
  • Granite platform to a maximum of 10' ft, Stainless Steel Sink (single bowl).
Bathrooms
  • IWC / EWC with flush tank.
  • EWC, IWC and Wash basin of Parryware or Neycer brand in all bathrooms.
  • Chromium plated fittings.
  • Hot and cold water mixer with shower
  • Provision for geysers in all bathrooms
Electricals
  • Concealed copper wiring in conduits for lights, fan, and power plug points.
  • Power outlets for Air conditioners in all bedrooms
  • Power outlets for geysers in all bathrooms.
  • Power plug for mixer/grinder in kitchen.
  • Plug points for refrigerator, T.V., in hall/dinning single.
  • 20 amps 3 phase supply for each unit and individual meter boards
  • Anchor Switches.
Lofts, wardrobes & cupboards:
  • Open type
  • One each in the kitchen And Bedrooms
Painting
  • Ceiling: 3 coats of white.
  • Walls: 2 coats of Emulsion over 2 coat of primer
  • Main Door - Varnish
  • Other Doors - Enamel
Water
  • One tap for Corporation water supply in the kitchen.
  • Taps in appropriate places for water from bore well.
  • Sump and overhead tank of sufficient capacity.
  • Single phase pump – 2 nos.
Common Amenities
  • Septic Tank
  • Marble flooring in the corridors, lobby and Staircase.
  • Landscaping
  • Anti – termite treatment.
  • Compound wall with gate.
  • Rain water Harvesting
Project Payment Plan - Congate Flat V
  • Advance - 10%
  • Before Reg - 20%
  • Excavation - 15%
  • Plinth Level - 15%
  • Ground Floor Roof - 10%
  • First Floor Roof - 10%
  • Second floor roof - 10%
  • Brick Work - 5%
  • Final Payment - 5%


x

Receive all updates via G+ and Facebook


Get This